NB/T 11726-2024 NB/T 11726-2024 Wind Farm Engineering Environmental Protection Design Specification
This standard applies to the environmental protection design of onshore wind farms and offshore wind farms.
Current Category: CN-NB - Energy
This standard applies to the environmental protection design of onshore wind farms and offshore wind farms.
This regulation applies to the design and construction of grouting connections for the infrastructure of offshore wind farms. This regulation does not apply to grouting for rock-embedded pile foundations.
This regulation applies to large-scale hydropower projects and medium-sized hydropower projects with complex seismic and geological conditions.
This procedure is applicable to the evaluation of the fish passage effect of hydropower projects.
This guideline is applicable to the ecological risk assessment of hydropower projects.
This standard applies to the design of labor safety and occupational health for power generation projects that use direct combustion and primarily burn agricultural and forestry biomass as fuel.
This guideline is applicable to the on-site test prediction and inverse calculation analysis of the hydraulic transition process in new, renovated, and expanded hydropower stations.
This procedure is applicable to the quality inspection of chemical grouting after grouting in hydropower projects.
This standard applies to the design of offshore photovoltaic power generation systems with a capacity of 100 kWp or more.
This document is mainly applicable to the preparation of investment estimates for large and medium-sized hydropower stations and pumped storage power stations in the construction planning phase in China. Other hydropower projects can refer to it for implementation.
This document is applicable to the preparation of investment estimates for large and medium-sized hydropower stations and pumped storage power stations built in China. Other hydropower projects can refer to and implement it accordingly.
This standard applies to the anti-seismic design of new, renovated, and expanded hydropower projects, as well as the post-earthquake anti-seismic review of hydropower projects.