PDF
GB/T 19115.2-2018 Active
GB/T 19115.2-2018 Wind-solar photovoltaic hybrid generate electricity system—Part 2:Test methods
Abstract
This part of GB/T 19115 specifies the test objectives, test conditions, test preparation, and test methods, as well as inspection standards for wind-solar hybrid power generation systems (hereinafter referred to as the system). This part is applicable to off-grid and grid-connected systems that combine wind power and photovoltaic power, and to wind power generation systems with a swept area of less than 200 m2 and an output voltage of less than 1,000 V AC or 1,500 V DC, or their wind-solar hybrid power generation systems.
General Product Information
| Document Type | National standards |
|---|---|
| Standard Status | Active |
| Standard Code | GB/T 19115.2-2018 |
| CCS | Wind energy |
| ICS | Wind power generation systems and other energy sources |
| Implement Date | 2019-04-01 |
Price
$ 36.00
Subtotal
$ 36.00
Tax
$ 0.00
Order Total (incl. tax)
$ 36.00