GB/T 19115.2-2018 Active National standards

GB/T 19115.2-2018 Wind-solar photovoltaic hybrid generate electricity system—Part 2:Test methods

GB/T 19115.2-2018 Wind-solar photovoltaic hybrid generate electricity system—Part 2:Test methods

Publish Date: 2018-09-17 Implement Date: 2019-04-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us

Basic Information

Standard Code: GB/T 19115.2-2018
Standard Type: National standards
Standard Status: Active
is_force_gb: no
CCS Name: Wind energy
ICS Name: Wind power generation systems and other energy sources
Publish Date: 2018-09-17
Implement Date: 2019-04-01
Pages: 12 pages

Scope

This part of GB/T 19115 specifies the test objectives, test conditions, test preparation, and test methods, as well as inspection standards for wind-solar hybrid power generation systems (hereinafter referred to as the system). This part is applicable to off-grid and grid-connected systems that combine wind power and photovoltaic power, and to wind power generation systems with a swept area of less than 200 m2 and an output voltage of less than 1,000 V AC or 1,500 V DC, or their wind-solar hybrid power generation systems.

Development Information

Word Count: 22 Thousand words Pages: 12 pages

Same series standard

Replace the following standards

Referenced Standards

GB/T 9535-1998 Crystalline silicon terrestrial photovoltaic(PV) modules-design qualification and type approval GB 17646-1998 Safety of small wind turbine generator systems GB/T 17646-2013 Design requirements for small wind turbines GB/T 17646-2017 Small wind turbines GB/T 19068.2-2003 Off-grid wind turbine generator system—Part 2:Test method GB/T 19068.2-2017 Small wind turbines—Part 2:Test method GB/T 19068.3-2003 Off-grid wind turbine generator system—Part 3:Wind tunnel test methods GB/T 19068.3-2019 Small wind turbines—Part 3:Wind tunnel test methods GB/T 19115.1-2003 Off-grid type wind-solar photovoltaic hybrid generate electricity system of household-use—Part 1:Technology condition GB/T 19115.1-2018 Wind-solar photovoltaic hybrid generate electricity system—Part 1:Technical condition GB/T 20321.2-2006 Inverter of wind and solar energy supply power system for off-grid—Part 2:Testing method GB/T 22473-2008 Lead-acid storage batteries used for energy storage GB/T 22473.1-2021 Batteries used for energy storage—Part 1:Photovoltaic off-grid application technical conditions GB/T 30427-2013 Technical requirements and test methods for grid-connected PV inverters GB/T 34521-2017 Controller of small wind turbines GB/T 9535.1-2025 Terrestrial photovoltaic (PV)modules—Design qualification and type approval—Part 1:Test requirements GB/T 9535.2-2025 Terrestrial photovoltaic(PV)modules—Design qualification and type approval—Part 2:Test procedures GB/T 9535.101-2025 Terrestrial photovoltaic(PV) modules—Design qualification and type approval—Part 1-1:Special requirements for testing of crystalline silicon photovoltaic(PV) modules

Related Standards

Contact Us