PDF
DL/T 5113.11-2005 Active
DL/T 5113.11-2005 Quality degree evaluate standard of unit engineering for hydropower and water conservancy construction engineering Part 11:Bulb turbine and generator units installation engineering
General Product Information
| Document Type | Industry standards-Electricity |
|---|---|
| Standard Status | Active |
| Standard Code | DL/T 5113.11-2005 |
| CCS | Installation and testing of power system equipment |
| ICS | Generator |
| Implement Date | 2006-06-01 |
Price
$ 20.00
Subtotal
$ 20.00
Tax
$ 0.00
Order Total (incl. tax)
$ 20.00