GB/T 13633-1992
Replaced
DL/T 5113.11-2005
Active
Industry standards-Electricity
DL/T 5113.11-2005 Quality degree evaluate standard of unit engineering for hydropower and water conservancy construction engineering Part 11:Bulb turbine and generator units installation engineering
DL/T 5113.11-2005 Quality degree evaluate standard of unit engineering for hydropower and water conservancy construction engineering Part 11:Bulb turbine and generator units installation engineering
Basic Information
Standard Code:
DL/T 5113.11-2005
Standard Type:
Industry standards
Standard Status:
Active
is_force_gb:
no
CCS Name:
Installation and testing of power system equipment
ICS Name:
Generator
Publish Date:
2005-11-28
Implement Date:
2006-06-01
Pages:
43 pages
Development Information
Same series standard
Referenced Standards
DL/T 827-2002 Lamp-through Flow-through Turbine Generator Set Start-up Test Regulations
GB 11120-1989 Turbine oils L-TSA
GB 11120-2011 Lubricating oils for turbines
GB 50150-2016 Electric equipment installation engineering - standard for hand-over test of electric equipment
GB/T 8564-2003 Specification installation of hydraulic turbine generator units
JB 8439-1996 High-voltage motors require anti-corona technology for use in high-altitude areas
JB/T 8439-2008 High voltage AC motor anti-corona technology requirements for use in high altitude areas
Related Standards
GB/T 1029-1993
Replaced
GB/T 1029-1993 Test procedures for three-phase synchronous machines
GB/T 4997-1993
Replaced
GB/T 4997-1993 Permanent magnet low speed direct current tachogenerator, General specification for
GB/T 7408-1994
Replaced
GB/T 7408-1994 Data elements and interchange formats—Information interchange—Representation of dates and times
GB/T 15548-1995
Replaced
GB/T 15548-1995 General specification for three-phase synchronous generator driven by reciprocating internal combustion engine
GB/T 7409.1-1997
Replaced