PDF

GB/T 25387.2-2021 Active

GB/T 25387.2-2021 Wind turbines generator system—Full-power converter—Part 2:Test method

Available format(s)
PDF
Language(s)
Chinese
Publish Date
2021-03-09

Abstract

This part of GB/T 25387 specifies the test conditions and test methods for full-power AC/DC voltage converters (hereinafter referred to as "converter") of wind power generation units (hereinafter referred to as "unit"). This part is applicable to the testing and inspection of full-power AC/DC voltage converters used in wind power generation units.

General Product Information

Document Type National standards
Standard Status Active
Standard Code GB/T 25387.2-2021
CCS Wind energy
ICS Wind power generation systems and other energy sources
Implement Date 2021-10-01
Price $ 75
Subtotal $ 75
Tax $ 0.00
Order Total (incl. tax) $ 75

Log In

Contact Us