PDF
GB/T 25387.2-2021 Active
GB/T 25387.2-2021 Wind turbines generator system—Full-power converter—Part 2:Test method
Abstract
This part of GB/T 25387 specifies the test conditions and test methods for full-power AC/DC voltage converters (hereinafter referred to as "converter") of wind power generation units (hereinafter referred to as "unit"). This part is applicable to the testing and inspection of full-power AC/DC voltage converters used in wind power generation units.
General Product Information
| Document Type | National standards |
|---|---|
| Standard Status | Active |
| Standard Code | GB/T 25387.2-2021 |
| CCS | Wind energy |
| ICS | Wind power generation systems and other energy sources |
| Implement Date | 2021-10-01 |
Price
$ 75
Subtotal
$ 75
Tax
$ 0.00
Order Total (incl. tax)
$ 75