T/ACCEM 658-2025 Active Group standards

T/ACCEM 658-2025 Technical guidelines for location and capacity planning of distributed energy storage and PV in distribution network

T/ACCEM 658-2025 Technical guidelines for location and capacity planning of distributed energy storage and PV in distribution network

Publish Date: 2025-08-28 Implement Date: 2025-09-27 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/ACCEM 658-2025
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: Comprehensive analysis of insulating fluids
Publish Date: 2025-08-28
Implement Date: 2025-09-27

Scope

This document specifies the terms and definitions, basic requirements, planning process, data collection and processing, resource assessment, load characteristic analysis, grid condition assessment, site selection and sizing method, planning scheme evaluation and optimization, and implementation and monitoring requirements for the siting and sizing of distributed energy storage and photovoltaic systems in distribution networks. This document is applicable to the siting and sizing planning of distributed energy storage and photovoltaic systems in newly built, expanded, and modified 10 kV and lower distribution networks.

Development Information

Related Standards

Contact Us