GB/T 14541-1993
Replaced
NB/T 11115-2023
Active
Industry standards-Energy
NB/T 11115-2023 Technical guidelines for smart power system in coal mine
NB/T 11115-2023 Technical guidelines for smart power system in coal mine
Basic Information
Standard Code:
NB/T 11115-2023
Standard Type:
Industry standards
Standard Status:
Active
is_force_gb:
no
CCS Name:
Power stations and the operation and maintenance of power systems
ICS Name:
Integrated power station
Publish Date:
2023-02-06
Implement Date:
2023-08-06
Pages:
20 pages
Scope
This document defines the relevant terms and definitions of the intelligent power supply system for coal mines, clarifies the technical principles and system architecture for the construction and transformation of the intelligent power supply system for coal mines, and stipulates the requirements for the equipment functions and system functions of the intelligent power supply system for coal mines. This document is applicable to the intelligent power supply system for coal mines, which is composed of surface and underground substations of shaft coal mines with a voltage level of 110 kV and below.
Development Information
Referenced Standards
GB/T 2900.50-1998 Electrotechnical terminology Generation, transmission and distribution of electricity—General
GB/T 2900.50-2008 Electrotechnical terminology—Generation,transmission and distribution of electricity—General
GB/T 2900.57-2002 Electrotechnical terminology—Generation, transmission and distribution of electricity—Operation
GB/T 2900.57-2008 Electrotechnical terminology—Generation,transmission and distribution of electricity—Operation
GB 14285-1993 Technical code for relaying protection and security automatic equipment
GB/T 14285-2006 Technical code for relaying protection and security automatic equipment
GB/T 14285-2023 Technical code for relaying protection and security automatic equipment
GB/T 19862-2005 General requirements for monitoring equipments of power quality
GB/T 19862-2016 General requirements for monitoring equipment of power quality
GB/T 19862-2025 General requirements for monitoring equipment of power quality
GB/T 25931-2010 Precision clock synchronization protocol for networked measurement and control systems
GB/T 30155-2013 Technical guide for smart substation
GB/T 34121-2017 Technical specification for relay protection configuration tool in smart substation
GB/T 37546-2019 Technical specification for unattended substation monitoring and control system
GB/T 40435-2021 Technical specifications for substation data communication gateway
GB/T 40773-2021 Technical specification of monitoring and control system for auxiliary facilities in substation
GB 50070-2020 Code for design of electric power in mine
DL/T 283.1-2018 Electric power video surveillance system and interface - Part 1: Technical requirements
DL/T 283.1-2012 Power video surveillance system and interfaces Part 1:Technical requirements
DL/T 478-2013 General Technical Requirements for Relay Protection and Safety Automatic Devices
DL/T 478-2010 General Technical Requirements for Relay Protection and Safety Automatic Devices
DL/T 478-2001 Static General Technical Requirements for Relay Protection and Safety Automatic Devices
DL/T 553-2013 Electric Power System Dynamic Recording Device General Technical Specification
DL/T 553-1994 Technical Guidelines for Dynamic Record of Power System Faults in 220-500kV Power Systems
DL/Z 860.1-2018 DL/Z 860.1-2018 Electric power automation communication networks and systems Part 1: General introduction
DL/Z 860.1-2004 Substation communication networks and systems - Part 1: General introduction
DL/Z 860.2-2006 Substation communication networks and systems - Part 2: Terminology
DL/T 860.3-2004 Communication networks and systems in substations-Part 3:General requirements
DL/T 860.4-2018 Electric power automation communication networks and systems - Part 4: Systems and project management
DL/T 860.4-2004 Substation communication networks and systems - Part 4: System and project management
DL/T 860.6-2012 DL/T 860.6-2012 Electric Power Enterprise Automation Communication Network and System Part 6: Communication Configuration Description Language Related to Intelligent Electronic Devices in Substation
DL/T 860.6-2008 Substation communication network and system - Part 6: Communication configuration description language related to intelligent electronic devices in substation
DL/T 860.10-2018 Part 10 of the guidelines for electric power automation communication networks and systems: Conformance testing
DL/T 860.10-2006 Substation communication networks and systems - Part 10: Conformance testing
DL/T 860.71-2014 Power automation communication networks and systems - Part 7-1: Basic communication architecture principles and models
DL/T 860.71-2006 Substation communication networks and systems - Part 7-1: Basic communication architecture and models for substation and feeder equipment
DL/T 860.72-2013 Power automation communication networks and systems - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI)
DL/T 860.72-2004 Substation communication networks and systems - Part 7-2: Basic communication structure for substation and feeder equipment - Abstract communication service interface (ACSI)
DL/T 860.73-2013 Power automation communication networks and systems - Part 7-3: Basic communication structure for public data classes
DL/T 860.73-2004 Substation communication networks and systems - Part 7-3: Basic communication structure for substation and feeder equipment - Public data classes
DL/T 860.74-2014 Electric power automation communication networks and systems - Part 7-4: Basic communication structure compatible logical node classes and data classes
DL/T 860.74-2006 Substation communication networks and systems - Part 7-4: Basic communication structure for substation and feeder equipment - Compatibility of logical node classes and data classes
DL/T 860.81-2016 DL/T 860.81-2016 Electricity automation communication network and system Part 8-1: Specific communication service mapping (SCSM) - Mapping to MMS (ISO 9506-1 and ISO 9506-2) and ISO/IEC 8802-3
DL/T 860.81-2006 Substation Communication Network and System Part 8-1: Mapping of Specific Communication Services (SCSM) to MMS (ISO 9506-1 and ISO 9506-2) and ISO/IEC 8802-3
DL/T 860.91-2006 Substation communication networks and systems - Part 9-1: Mapping of specific communication services (SCSM) on a unidirectional multipoint point-to-point serial communication link for sampled values
DL/T 860.92-2016 Electric power automation communication networks and systems - Part 9-2: Specific communication service mapping (SCSM) - Sampling values based on ISO/IEC 8802-3
DL/T 860.92-2006 Substation communication networks and systems - Part 9-2: Mapping of specific communication services mapping (SCSM) to ISO/IEC 8802-3 to sample values only
DL/T 860.801-2016 Electric power automation communication networks and systems - Part 80-1: Application guidelines for exchanging information based on CDC data model using DL/T 634.5101 or DL/T 634.5104 switching system
DL/T 860.901-2014 Power automation communication network and system Part 901: Application of DL/T 860 in inter-substation communication. (Note: English translation provided)
DL/T 860.904-2018 Power automation communication networks and systems - Part 90-4: Network engineering guidelines
DL/T 860.7410-2016 Power Automation Communication Networks and Systems Part 7-410: Basic Communication Architecture for Monitoring and Control of Hydropower Plants
DL/T 860.7420-2012 Electricity enterprise automation communication network and system Part 7-420: Basic communication structure Distributed energy logic nodes
DL/Z 860.7510-2016 Power Automation Communication Networks and Systems Part 7-510: Basic Communication Architecture, Hydropower Plant Modeling Principles and Application Guidelines
DL/T 1100-2009 Electric power system time synchronization system - Part 1: Technical specification
DL/T 1100.1-2018 Power system time synchronization system - Part 1: Technical specification
DL/T 1100.1-2009 Time synchronism systems of power system Part 1:Technical specifications
DL/T 1100.2-2013 Power system time synchronization system - Part 2: Precise time synchronization based on LAN
DL/T 1100.3-2018 Power system time synchronization system - Part 3: Digital synchronization network-based time synchronization technical specification
DL/T 1100.4-2018 Electric power system time synchronization system - Part 4: Test instrument technical specification
DL/T 1100.6-2018 Power system time synchronization system - Part 6: Monitoring specifications
DL/T 1230
DL/T 1230-2013 DL/T 1230-2013 Specification for Graphic Representation of Power System。
DL/T 1230-2016 Power System Graphic Specification Language
DL/T 1403-2015 Intelligent Substation Monitoring System Technical Specification
DL/T 1404-2015 Substation monitoring system technical specifications for preventing electrical misoperation
DL/T 1404-2024 DL/T 1404-2024 Substation Monitoring System Technical Specification for Preventing Electrical Misoperation
DL/T 1708-2017 Power system sequence control technical specification
DL/T 5044-2014 Electric power engineering DC power supply system design technical regulations
DL/T 5044-2004 Technical code for designing DC system of power projects
DL/T 5491-2014 Electric Power Engineering Intermittent Power Supply Design Technical Specification
MT/T 570-1996 coal mine electrical diagram dedicated graphic symbols
MT/T 1007-2006 Information transmission interface for coal mine
MT/T 1081-2007 Mine Network Switch
MT/T 1081-2008 Network switch for a coal mine
MT/T 1114-2011 General specifications of the power supply supervision system in the coal mine
MT/T 1131-2011 Mining Ethernet
NB/T 10051-2018 Coal mine power supply anti-jump system
Related Standards
GB/T 14542-1993
Replaced
GB/T 14542-1993 Guide for maintenance and supervision of transformer oil in service
GB/T 2819-1995
Active
GB/T 2819-1995 Mobile electric power plant, general specification for
GB/T 15149.2-1998
Abolished
GB/T 15149.2-1998 Performance and testing of teleprotection eguipment of power systems Part 2:Analogue comparison systems
GB/T 15153.1-1998
Replaced
GB/T 15153.1-1998 Telecontrol equipment and systems Part 2:Operating conditions Section 1:Power supply and electromagnetic compatibility
GB/T 17463-1998
Active