GB/T 34131-2023
Active
National standards
GB/T 34131-2023 Battery management system for electrical energy storage
GB/T 34131-2023 Battery management system for electrical energy storage
Basic Information
Standard Code:
GB/T 34131-2023
Standard Type:
National standards
Standard Status:
Active
is_force_gb:
no
CCS Name:
New energy and other
ICS Name:
Wind power generation systems and other energy sources
Publish Date:
2023-03-17
Implement Date:
2023-10-01
Publisher:
国家市场监督管理总局、国家标准化管理委员会
Technical Committee:
全国电力储能标准化技术委员会(SAC/TC 550)
Pages:
39 pages
Scope
本文件规定了电力储能用电池管理系统(简称“电池管理系统”)数据采集、通信、报警和保护、控制、能量状态估算、均衡、绝缘电阻检测、绝缘耐压、电气适应性、电磁兼容等要求,描述了相应的试验方法,规定了分类和编码、正常工作环境、检验规则、标志、包装、运输和贮存等内容。本文件适用于电力储能用锂离子电池、钠离子电池、铅酸(炭)电池、液流电池和水电解制氢/燃料电池的电池管理系统的设计、制造、试验、检测、运行、维护和检修,其他类型电池管理系统参照执行。
Development Information
Drafting Units:
中国电力科学研究院有限公司、杭州高特电子设备股份有限公司、宁德时代新能源科技股份有限公司、阳光电源股份有限公司、北京海博思创科技股份有限公司、杭州科工电子科技有限公司、杭州协能科技股份有限公司、合肥国轩高科动力能源有限公司、平高集团储能科技有限公司、大连融科储能技术发展有限公司、北京和瑞储能科技有限公司、蜂巢能源科技(无锡)有限公司、浙江南都能源互联网有限公司、国网浙江省电力有限公司电力科学研究院、国网安徽省电力有限公司电力科学研究院、河南豫氢动力有限公司、山东赛克赛斯氢能源有限公司、武汉众宇动力系统科技有限公司
Drafting Persons:
许守平、谢建江、张旭、杜荣华、官亦标、高俊娥、夏晨强、胡娟、魏志立、刘家亮、郭富强、李娟、王浩、吴冠军、陈娟、王萍、宋欣民、李志强、徐剑虹、邵俊伟、姜科、范茂松、田刚领、沈玉、刘爱华、赵海军、李小龙、刘雨佳、张玮、郭翠静、谈作伟、谭建国、张建彪、刘敏、付珊珊、刘皓、吴贤章、汪飞杰、黄方、左彬、滕越、宋清爽、樊义兴、褚永金、闫雪生
Replace the following standards
Referenced Standards
DL/T 860.10-2018 Part 10 of the guidelines for electric power automation communication networks and systems: Conformance testing
DL/T 860.10-2006 Substation communication networks and systems - Part 10: Conformance testing
DL/T 860.71-2014 Power automation communication networks and systems - Part 7-1: Basic communication architecture principles and models
DL/T 860.71-2006 Substation communication networks and systems - Part 7-1: Basic communication architecture and models for substation and feeder equipment
DL/T 860.72-2013 Power automation communication networks and systems - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI)
DL/T 860.72-2004 Substation communication networks and systems - Part 7-2: Basic communication structure for substation and feeder equipment - Abstract communication service interface (ACSI)
DL/T 860.73-2013 Power automation communication networks and systems - Part 7-3: Basic communication structure for public data classes
DL/T 860.73-2004 Substation communication networks and systems - Part 7-3: Basic communication structure for substation and feeder equipment - Public data classes
DL/T 860.74-2014 Electric power automation communication networks and systems - Part 7-4: Basic communication structure compatible logical node classes and data classes
DL/T 860.74-2006 Substation communication networks and systems - Part 7-4: Basic communication structure for substation and feeder equipment - Compatibility of logical node classes and data classes
DL/T 860.81-2016 DL/T 860.81-2016 Electricity automation communication network and system Part 8-1: Specific communication service mapping (SCSM) - Mapping to MMS (ISO 9506-1 and ISO 9506-2) and ISO/IEC 8802-3
DL/T 860.81-2006
DL/T 860.91-2006 Substation communication networks and systems - Part 9-1: Mapping of specific communication services (SCSM) on a unidirectional multipoint point-to-point serial communication link for sampled values
DL/T 860.92-2016 Electric power automation communication networks and systems - Part 9-2: Specific communication service mapping (SCSM) - Sampling values based on ISO/IEC 8802-3
DL/T 860.92-2006 Substation communication networks and systems - Part 9-2: Mapping of specific communication services mapping (SCSM) to ISO/IEC 8802-3 to sample values only
DL/T 860.801-2016 Electric power automation communication networks and systems - Part 80-1: Application guidelines for exchanging information based on CDC data model using DL/T 634.5101 or DL/T 634.5104 switching system
DL/T 860.901-2014 Power automation communication network and system Part 901: Application of DL/T 860 in inter-substation communication. (Note: English translation provided)
DL/T 860.904-2018 Power automation communication networks and systems - Part 90-4: Network engineering guidelines
DL/T 860.7410-2016 Power Automation Communication Networks and Systems Part 7-410: Basic Communication Architecture for Monitoring and Control of Hydropower Plants
DL/T 860.7420-2012 Electricity enterprise automation communication network and system Part 7-420: Basic communication structure Distributed energy logic nodes
DL/Z 860.7510-2016 Power Automation Communication Networks and Systems Part 7-510: Basic Communication Architecture, Hydropower Plant Modeling Principles and Application Guidelines
DL/T 2528-2022 Electric energy storage basic terminology
Related Standards
GB 17646-1998
Replaced
GB 18451.1-2001
Replaced
GB 18451.1-2001 Wind turbine generator systems—Safety requirements
GB/T 2900.53-2001
Active
GB/T 2900.53-2001 Electrotechnical terminology—Wind turbine generator systems
GB/T 18709-2002
Active
GB/T 18709-2002 Methodology of wind energy resource measurement for wind farm
GB/T 18710-2002
Active
GB/T 18710-2002 Methodology of wind energy resource assessment for wind farm
GB/T 4750-2002
Replaced