CJ/T 300-2008 Replaced Industry standards-Urban construction

CJ/T 300-2008 Water hammer arrestor for water supply systems of buildings

CJ/T 300-2008 Water hammer arrestor for water supply systems of buildings

Publish Date: 2008-12-12 Implement Date: 2009-06-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us

Basic Information

Standard Code: CJ/T 300-2008
Standard Type: Industry standards
Standard Status: Replaced
is_force_gb: no
CCS Name: Water supply and drainage projects
ICS Name: Other standards related to water quality
Publish Date: 2008-12-12
Implement Date: 2009-06-01
Pages: 24 pages

Scope

This standard specifies the structural form, product models, requirements, test methods, inspection rules, marking, packaging, storage and transportation of water hammer absorbers for building water supply (hereinafter referred to as absorbers).
This standard applies to water hammer absorbers used in water supply pipelines with nominal sizes of DN15 to DN400, nominal pressures not exceeding PN40, and water temperatures ranging from 0°C to 70°C. It can also be used for water hammer absorbers in other water supply and distribution pipelines with the same or similar media and operating conditions.

Development Information

Word Count: 35 Thousand words Pages: 24 pages

Superseded by the following standards

Related Standards

Contact Us