GB/T 14598.10-2012 Abolished National standards

GB/T 14598.10-2012 Measuring relays and protection equipment—Part 22-4:Electrical disturbance tests—Electrical fast transient/burst immunity test

GB/T 14598.10-2012 Measuring relays and protection equipment—Part 22-4:Electrical disturbance tests—Electrical fast transient/burst immunity test

Publish Date: 2012-06-29 Implement Date: 2012-11-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us

Basic Information

Standard Code: GB/T 14598.10-2012
Standard Type: National standards
Standard Status: Abolished
is_force_gb: no
CCS Name: Relay protection and automatic devices
ICS Name: Relay
Publish Date: 2012-06-29
Implement Date: 2012-11-01
Pages: 12 pages

Scope

This part of GB/T 14598 is based on GB/T 17626.4-2008 and, with reference to the applicable parts of that publication, specifies the general requirements for electrical fast transient immunity tests. These tests are applicable to metering relays and protection devices used in power systems, including control, monitoring, and process interface equipment used with these devices.
The purpose of the tests is to verify whether the tested devices can function properly when they are activated and subjected to repetitive fast transients (pulse groups) caused by events such as the disconnection of inductive loads or the bouncing of relay contacts.
The requirements of this part apply to new metering relays and protection devices, and all tests are only for type testing purposes.

Development Information

Word Count: 19 Thousand words Pages: 12 pages

Same series standard

Replace the following standards

Referenced Standards

Adopt standards

IEC 60255-22-4:2008

Related Standards

Contact Us