T/SSESB 000002-2021 Environmental Monitoring Laboratory Information Management System Construction Technical Guideline
T/SSESB 000002-2021 Environmental Monitoring Laboratory Information Management System Construction Technical Guideline
Basic Information
Scope
Main Technical Content: 5. System Functional Requirements 5.1 General Requirements The functional requirements for the construction of an information management system for ecological environment monitoring laboratories shall be based on the General Requirements for the Qualification Assessment of Inspection and Testing Organizations and the Supplementary Requirements for Ecological Environment Monitoring Organizations, and shall also comply with the general requirements of GB/T 27025. The LIMS should be built according to the laboratory's own needs, and its functions should meet the core functional requirements. When appropriate, additional functions can be added (see Appendix A). 5.2 Monitoring Business Process Management 5.2.1 Typical Monitoring Business Process The monitoring business process management module should have the function of customizing business flows. Combined with the technical specifications of the ecological environment monitoring industry and the actual work processes of various institutions, different types of monitoring business can be customized to meet the characteristics of the laboratory's own business through workflow tools. The monitoring business process management module should include but is not limited to the following functions: task registration, contract review, monitoring plan preparation, on-site monitoring, sample management, data entry and processing, data verification and review, report preparation, review and issuance, and task archiving. 5.2.2 Task Registration The task registration module should accept tasks of various monitoring types and have the functions of maintaining and managing information such as monitoring tasks, monitoring points, and samples. The monitoring task information should include the commissioning unit, task name (number), monitoring category, commissioning time, responsible unit information, tested unit information, task type, report issuance requirements, monitoring items, subcontra