NB/T 31003.2-2022 Active Industry standards-Energy

NB/T 31003.2-2022 Wind power plant access to power system design technical specifications Part 2: Offshore wind power

NB/T 31003.2-2022 Wind power plant access to power system design technical specifications Part 2: Offshore wind power

Publish Date: 2022-11-04 Implement Date: 2023-05-04 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us

Basic Information

Standard Code: NB/T 31003.2-2022
Standard Type: Industry standards
Standard Status: Active
is_force_gb: no
CCS Name: Wind energy
ICS Name: Electric engineering (vocabulary)
Publish Date: 2022-11-04
Implement Date: 2023-05-04

Scope

1.0.1 In order to better implement the relevant national policies and guidelines for the design of offshore wind farms connected to the power system, and to standardize the design of offshore wind farms connected to the power system, this standard is hereby formulated. 1.0.2 This standard applies to new offshore wind farms connected to the power system through lines with a voltage level of 110 kV (66 kV) and above. Extension (modification) projects may refer to and implement it accordingly. 1.0.3 In addition to complying with this standard, the design of offshore wind farms connected to the power system shall also comply with the provisions of the relevant national standards currently in force.

Development Information

Same series standard

Replace the following standards

NB/T 31003-2011

Related Standards

Contact Us