T/CBDA 1005-2023
Active
Group standards
\nT/CBDA 1005-2023 Photovoltaic Building Power Generation System Testing
T/CBDA 1005-2023
Price:
$ 20.00
Basic Information
Standard Code:
T/CBDA 1005-2023
Standard Type:
Group standards
Standard Status:
Active
is_force_gb:
no
CCS Name:
-
ICS Name:
Wall, partition wall, and curtain wall
Publish Date:
2023-09-05
Implement Date:
2023-12-01
Pages:
14 pages
Scope
Scope: Applicable to the laboratory testing of photovoltaic building power generation systems in new, renovated, and expanded photovoltaic buildings, where the DC power supply does not exceed 1000V and the AC voltage does not exceed 400V. On-site testing can be carried out in accordance with this document. This document is not applicable to the application form of adding photovoltaic modules to buildings. Main technical content: 1. Scope; 2. Normative reference documents; 3. Terms and definitions; 4. Test specimens; 5. Preparatory work; 6. Testing requirements and methods; 7. Testing process; 8. Testing report
Development Information
Related Standards
JG/T 205-2007
Abolished
GB/T 15227-2007
Replaced
GB/T 15227-2007 Test method of air permeability, water tightness, wind load resistance performance for curtain walls
GB/T 21086-2007
Active
GB/T 21086-2007 Curtain wall for building
GB/T 22631-2008
Active
GB/T 22631-2008 Vertical building elements—Impact resistance test—Impact bodies and general test procedures
GB/T 23449-2009
Active
GB/T 23449-2009 Hollow concrete panel contained solid wastes for partition wall
GB/T 23450-2009
Replaced