T/CAMIE 12-2023 Active Group standards

T/CAMIE 12-2023 Co-treatment of Sludge with Coal-fired Power Plant Boiler Technology Specification

T/CAMIE 12-2023 Co-treatment of Sludge with Coal-fired Power Plant Boiler Technology Specification

Publish Date: 2023-08-09 Implement Date: 2023-09-09 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/CAMIE 12-2023
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: The water supply system
Publish Date: 2023-08-09
Implement Date: 2023-09-09

Scope

Scope: This document specifies the terms and definitions, equipment processes and technical requirements, construction and acceptance requirements, and production operation management and maintenance requirements for coal-fired power generation boilers that co-process sludge. This document applies to coal-fired power generation boilers that burn sludge from urban wastewater treatment plants with a capacity of 300 MW or above; coal-fired power generation boilers that burn sludge from urban wastewater treatment plants with a capacity of less than 300 MW can also refer to and implement this document. This document can be used as a technical basis for the environmental impact assessment, construction and acceptance, and operation management and maintenance of coal-fired power generation boilers that co-process sludge from urban wastewater treatment plants in new, renovated, and expanded projects. Main technical content: This document specifies the terms and definitions, equipment processes and technical requirements, construction and acceptance requirements, and production operation management and maintenance requirements for coal-fired power generation boilers that co-process sludge.

Development Information

Related Standards

Contact Us