T/CSEE 0241.25-2022 Active Group standards

T/CSEE 0241.25-2022 Flexible AC Transmission Systems Part 25: System commissioning specifications

T/CSEE 0241.25-2022 Flexible AC Transmission Systems Part 25: System commissioning specifications

Publish Date: 2022-09-27 Implement Date: 2022-12-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/CSEE 0241.25-2022
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: Comprehensive analysis of insulating fluids
Publish Date: 2022-09-27
Implement Date: 2022-12-01

Scope

Main technical content: This document specifies the items, methods, and evaluation requirements for the commissioning of flexible DC grid projects with a voltage level of ±500 kV. Flexible DC projects with a voltage level below 500 kV can refer to this document to formulate relevant procedures. This document is applicable to single-pole symmetrical, single-pole asymmetrical, and double-pole symmetrical flexible DC transmission projects with bidirectional power transmission between the ends of the ±500 kV voltage level; multi-terminal flexible DC and multi-terminal ring network projects with bidirectional power transmission using single-pole symmetrical, single-pole asymmetrical, and double-pole symmetrical flexible DC transmission technologies. Flexible DC projects with a voltage level below 500 kV shall refer to this document for implementation.

Development Information

Related Standards

Contact Us