T/YJB 0039-2022 Active Group standards

T/YJB 0039-2022 Technical Specifications for Bridge Construction Using the Pivot Method

T/YJB 0039-2022

Publish Date: 2022-05-31 Implement Date: 2022-06-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/YJB 0039-2022
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: Bridge construction
Publish Date: 2022-05-31
Implement Date: 2022-06-01

Scope

Main technical content: Table of Contents 1 General Provisions 2 Terminology 3 Basic Requirements 3.1 General Provisions 3.2 Crossing Existing Roads 3.3 Crossing River Channels 3.4 Crossing Existing Railways 4 Rotating System Construction 4.1 General Provisions 4.2 Construction of Lower Turntables 4.3 Construction of Ball Joints 4.4 Construction of Upper Turntables 5 Rotation 5.1 General Provisions 5.2 Weighing and Counterweight 5.3 Trial Rotation 5.4 Rotation and Attitude Adjustment 5.5 Rotation Monitoring 6 Closing 6.1 General Provisions 6.2 Closing by Scaffolding Method 6.3 Closing by Hanging Basket Method 6.4 Closing by Hanging Frame Method

Development Information

Related Standards

Contact Us