T/CHTS 10108-2023 Active Group standards

T/CHTS 10108-2023 Road Concrete-filled Steel Tube Arch Bridge Cable-suspended Construction Techniques Guideline

T/CHTS 10108-2023 Road Concrete-filled Steel Tube Arch Bridge Cable-suspended Construction Techniques Guideline

Publish Date: 2023-08-14 Implement Date: 2023-08-28 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/CHTS 10108-2023
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: Bridge construction
Publish Date: 2023-08-14
Implement Date: 2023-08-28

Scope

Scope: Applicable to the construction of highway steel-concrete arch bridges using the cable-hoisting, cable-stayed, and cable-clamping method; Main technical content: General principles, terminology, materials, cable-hoisting system, cable-stayed and cable-clamping system, fabrication of arch rib segments, installation of arch rib segments, concrete pouring in the pipe, construction monitoring, as well as the construction requirements for temporary steel structure processing plants, test methods for limiting expansion rate, and test methods for self-generated volume deformation of concrete.

Development Information

Related Standards

Contact Us