CJJ 143-2010 Active Industry standards-Urban construction

CJJ 143-2010 Technical specification for buried plastic pipeline of sewer engineering

CJJ 143-2010 Technical specification for buried plastic pipeline of sewer engineering

Publish Date: 2010-05-18 Implement Date: 2010-12-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: CJJ 143-2010
Standard Type: Industry standards
Standard Status: Active
is_force_gb: no
CCS Name: Water supply and drainage projects
ICS Name: Drainage system
Publish Date: 2010-05-18
Implement Date: 2010-12-01
Pages: 50 pages

Scope

1.0.1 In order to achieve advanced technology, safe application, economic rationality, and ensure project quality in the design, construction, and acceptance of buried plastic drainage pipelines, these regulations are formulated. 1.0.2 These regulations apply to the design, construction, and acceptance of new, expanded, and modified non-pressure buried plastic drainage pipelines. 1.0.3 The wastewater transported by buried plastic drainage pipelines shall comply with the provisions of the current industry standard "Wastewater Discharge Standards for Urban Sewers" CJ 3082. 1.0.4 In addition to complying with the provisions of these regulations, the design, construction, and acceptance of buried plastic drainage pipelines shall also comply with the provisions of the current relevant national standards.

Development Information

Pages: 50 pages

Superseded by the following standards

Related Standards

Contact Us