T/DIPA 19-2023 Active Group standards

T/DIPA 19-2023 The design specification for a zero-carbon operating building's "source, storage, direct, and flexible" electric power system

T/DIPA 19-2023 The design specification for a zero-carbon operating building's "source, storage, direct, and flexible" electric power system

Publish Date: 2023-12-29 Implement Date: 2024-03-30 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/DIPA 19-2023
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: The comprehensive facilities in the building
Publish Date: 2023-12-29
Implement Date: 2024-03-30

Scope

Main technical content: This document specifies the general principles, loads, on-site power supply, energy storage, distribution power systems, energy management systems, and other requirements for the design of a "source-storage-direct-flexible" power distribution system for zero-carbon operation buildings. This document is applicable to the design of "source-storage-direct-flexible" power distribution systems with voltages below 1500V in new or renovated (expanded) buildings aiming for zero-carbon operation, and the design of power distribution systems in industrial parks can be referenced for implementation.

Development Information

Related Standards

Contact Us