GB/T 23507.2-2017 Active National standards

GB/T 23507.2-2017 Criterion for electrical equipment for oil drilling rig—Part 2:Control system

GB/T 23507.2-2017 Criterion for electrical equipment for oil drilling rig—Part 2:Control system

Publish Date: 2017-12-29 Implement Date: 2018-07-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us

Basic Information

Standard Code: GB/T 23507.2-2017
Standard Type: National standards
Standard Status: Active
is_force_gb: no
CCS Name: Oil drilling and extraction equipment and instruments
ICS Name: Exploration and drilling equipment
Publish Date: 2017-12-29
Implement Date: 2018-07-01
Pages: 33 pages

Scope

This part of GB/T 23507 specifies the terms and definitions, models and rated parameters, technical requirements, testing and marking, packaging, and storage and transportation of AC/DC drive control systems for oil drilling rigs. This part is applicable to power supply and control systems in onshore, desert oil and gas drilling rigs (workover rigs) and offshore drilling platforms (workover platforms), as well as AC/DC drive control systems for winches, drilling pumps, rotary tables/top drives, automatic drilling, auxiliary power supply, auxiliary electric drive systems, and peripheral electrical equipment involved in automation systems.

Development Information

Word Count: 58 Thousand words Pages: 33 pages

Same series standard

Related Standards

Contact Us