GB/T 18750-2002
Replaced
T/ACCEM 537-2025
Active
Group standards
T/ACCEM 537-2025 Integrated Hot Air Boiler for Biomass Fuel
T/ACCEM 537-2025 Biomass-fueled integral heat furnace
Price:
$ 20.00
Basic Information
Standard Code:
T/ACCEM 537-2025
Standard Type:
Group standards
Standard Status:
Active
is_force_gb:
no
CCS Name:
Energy, nuclear technology
ICS Name:
Burners and boilers integrated
Publish Date:
2025-04-17
Implement Date:
2025-05-16
Scope
Main technical content: This document specifies the terms and definitions, system composition, models, technical requirements, test methods, inspection rules, marking, packaging, transportation, and storage requirements for integrated hot blast stoves (hereinafter referred to as "hot blast stoves") using biomass pellets as fuel and employing indirect heating methods. This document is applicable to the design, manufacture, and inspection of integrated hot blast stoves using biomass pellets as fuel and employing indirect heating methods.
Development Information
Related Standards
GB/T 18750-2008
Replaced
GB/T 18750-2008 Municipal solid waste incinerator and boiler
GB/T 13922-2011
Active
GB/T 13922-2011 Performance test for water treatment equipment
GB/T 30580-2014
Replaced
GB/T 30580-2014 The technical guide for the life assessment of main pressure parts of power plant boiler
GB/T 30581-2014
Active
GB/T 30581-2014 The risk management method of power plant boiler pressure systems
GB/T 34352-2017
Active