GB/T 42151.4-2024 Active National standards

GB/T 42151.4-2024 Communication networks and systems for power utility automation—Part 4:System and project management

GB/T 42151.4-2024 Communication networks and systems for power utility automation—Part 4:System and project management

Publish Date: 2024-04-25 Implement Date: 2024-11-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 129
Out of stock

Basic Information

Standard Code: GB/T 42151.4-2024
Standard Type: National standards
Standard Status: Active
is_force_gb: no
CCS Name: The power system
ICS Name: The integrated transmission and distribution network
Publish Date: 2024-04-25
Implement Date: 2024-11-01
Pages: 44 pages

Scope

This document specifies the system and project management of the power automation system (UAS) with communication between intelligent electronic devices (IEDs) in various equipment fields of substations, as well as related system requirements.
It includes the following aspects:
—— Engineering processes and their supporting tools;
—— The lifecycle of the entire system and its IEDs;
—— Quality assurance starting from the R&D phase until the UAS and its IEDs are decommissioned and retired.
This document also specifies the requirements for system and project management processes, as well as the requirements for specialized support tools used in engineering and testing.
This document applies to projects related to the power automation system (UAS) process, such as the substation automation system (SAS).

Development Information

Word Count: 71 Thousand words Pages: 44 pages

Same series standard

Referenced Standards

IEC 60848 IEC 61082(所有部分) IEC 61175 IEC 61850-6:2018 IEC 61850-7(所有部分) IEC 81346(所有部分)

Adopt standards

IEC 61850-4:2020

Related Standards

Contact Us