GB/T 17005-1997
Replaced
GB/T 43949-2024
Active
National standards
GB/T 43949-2024 Drilling system of mobile offshore drilling rig—Configuration and technical requirement
GB/T 43949-2024 Drilling system of mobile offshore drilling rig—Configuration and technical requirement
Basic Information
Standard Code:
GB/T 43949-2024
Standard Type:
National standards
Standard Status:
Active
is_force_gb:
no
CCS Name:
The overall structure of the offshore platform
ICS Name:
Other standards related to shipbuilding and marine structures
Publish Date:
2024-04-25
Implement Date:
2024-11-01
Pages:
20 pages
Scope
This document specifies the general principles, configuration, and technical requirements of the drilling system of offshore mobile drilling platforms (hereinafter referred to as the "drilling system").
This document is applicable to the design of drilling systems for offshore mobile drilling platforms.
Development Information
Referenced Standards
GB/T 150.3-2011 Pressure vessels—Part 3:Design
GB/T 150.3-2024 Pressure vessels—Part 3:Design
GB/T 3766-2001 Hydraulic fluid power—General rules relating to systems
GB/T 3766-2015 Hydraulic fluid power—General rules and safety requirements for systems and their components
GB/T 7826-1987 Analysis techniques for system reliability—Procedure for failure mode and effects analysis(FMEA)
GB/T 7826-2012 Analysis techniques for system reliability—Procedure for failure mode and effects analysis(FMEA)
GB/T 7932-2003 Pneumatic fluid power—General rules relating to systems
GB/T 7932-2017 Pneumatic fluid power—General rules and safety requirements for systems and their components
GB/T 7935-2005 Hydraulic fluid power—General requirements for hydraulic components
GB/T 19190-2003 Petroleum and natural gas industries—Drilling and production equipment—Hoisting equipment
GB/T 19190-2013 Petroleum and natural gas industries—Drilling and production hoisting equipment
GB/T 19190-2025 Petroleum and natural gas industries—Drilling and production hoisting equipment
GB/T 23505-2017 Petroleum and natural gas industries—Petroleum drilling and workover rigs
GB/T 25428-2010 Petroleum and natural gas industries—Drilling and production equipment—Drilling and well-servicing structures
GB/T 25428-2015 Petroleum and natural gas industries—Drilling and production equipment—Drilling and well-servicing structures
GB/T 25428-2025 Petroleum and natural gas industries—Drilling and production equipment—Drilling and well-servicing structures
GB/T 28911-2012 Vocabulary of drilling engineering for the petroleum and natural gas
GB/T 29549.1-2023 Specifications for offshore modular drilling rigs on fixed platforms—Part 1:Design
GB/T 30217.1-2013 Petroleum and natural gas industries—Drilling and production equipment—Part 1:Design and operation of marine drilling riser equipment
GB/T 31049-2014 Top drive drilling equipment for oil drilling rigs
GB/T 31049-2022 Petroleum drilling and production equipment—Top drive system
SY/T 5053.2-2020 Petroleum and natural gas drilling and production equipment, wellhead control equipment, and flow control equipment control system
SY/T 5053.2-2007 Drilling wellhead control equipment and flow control equipment control system specifications
SY/T 5053.2-2001 SY/T 5053.2-2001 Surface blowout preventer and control equipment Control equipment
SY 5053.2-1991 Ground Preventive Valve and Control Device Control Device
SY 5080-1992 Drilling winch
SY/T 5080-2013 Drilling and workover rig's rotary table
SY/T 5080-2004 Petroleum drilling and completion equipment rotation mechanism
SY/T 5170-2013 Steel wire rope for use in the oil and natural gas industry
SY 5170-1992 Petroleum-resistant steel wire rope
SY/T 5170-1998 Steel wire rope specifications for use in the oil and natural gas industry
SY/T 5170-2008 Steel wire rope for use in the oil and natural gas industry
SY/T 5323-2016 Drilling and production equipment for the oil and natural gas industry, including devices for throttling and well-bailing
SY/T 5323-2004 Flushing and pressure control systems
SY/T 5532-2016 Drilling and well repairing winch for petroleum resources
SY/T 5532-1992 Pump jack winch oil drilling rig
SY/T 5532-2010 SY/T 5532-2010 Oil drilling rig winch
SY/T 5532-2002 Pump jack winch oil drilling rig。
SY/T 5612-2018 SY/T 5612-2018 Specification for drilling fluid solid control equipment for petroleum and natural gas drilling and production equipment
SY/T 5612-2007 Specification for solids control equipments of drilling fluid
SY/T 5612.1-1999 Drilling fluid purification system gas remover
SY/T 5612.2-1999 Drilling fluid cleaning system and cleaner
SY/T 5612.3-1999 Drilling fluid cleaning system, Cyclone
SY/T 5612.4-1993 Drilling fluid shakers
SY/T 5612.5-1993 Hook strip screens for drilling fluid shakers
SY/T 5612.6-2003 Drilling fluid cleaning system, horizontal centrifuge
SY/T 6868-2023 Oil and natural gas drilling and production equipment, well control system
SY/T 6868-2016 Drilling operation anti-blowout equipment system
SY/T 6868-2012 Recommended practices for blowout preventer equipment systems for drilling operations
SY/T 6913-2018 Oil and natural gas drilling and production equipment, specification for marine drilling isolation tubing equipment
SY/T 6913-2012 Ocean drilling riser equipment specification
SY/T 7460-2019 Petroleum and natural gas drilling and production equipment, floating drilling platform, drill string uplift compensation device
Related Standards
CB/T 3805-1997
Active
CB/T 3805-1997 Stern turning gland
CB/T 765-1997
Abolished
CB/T 765-1997 Catered material and coating specification for electric appliance,instrument and weapon
GB/T 17383-1998
Replaced
GB/T 17383-1998 Shipbuilding and marine structures—Dredgers—Classification
GB/T 19283-2003
Replaced
GB/T 19283-2003 Dimensions series of container ship passing the lock of three gorges dam
GB/T 17383-2007
Replaced