GB/T 17215.421-2008 Active National standards

GB/T 17215.421-2008 Electricity metering equipment (a.c.)—Tariff and load control—Part 21:Particular requirements for time switches

GB/T 17215.421-2008 Electricity metering equipment (a.c.)—Tariff and load control—Part 21:Particular requirements for time switches

Publish Date: 2008-08-06 Implement Date: 2009-03-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us

Basic Information

Standard Code: GB/T 17215.421-2008
Standard Type: National standards
Standard Status: Active
is_force_gb: no
CCS Name: \nElectricity measurement and load control system
ICS Name: The measurement of electrical and magnetic quantities
Publish Date: 2008-08-06
Implement Date: 2009-03-01
Pages: 10 pages

Scope

This part of GB/T 17215 specifies the special requirements for type testing of the latest manufactured indoor use and working reserve time switches. Time switches are commonly used in power load control, multi-rate metering devices, and maximum demand devices of energy metering equipment. The time switch maintains real-time, can save the date, and handle leap years. It also supports daylight saving time, that is, according to relevant rules, it can modify the deviation between local time and GMT. The time switch also has a synchronization function, and it saves a switch action program table, which can stipulate the time period, weekdays, or dates of the year or month. The time switch controls the output unit according to the time and the stored program table. This part does not set requirements for the internal structure of the time switch.

Development Information

Word Count: 15 Thousand words Pages: 10 pages

Same series standard

Replace the following standards

Referenced Standards

IEC 62052-21:2004

Adopt standards

IEC 62054-21:2004

Related Standards

Contact Us