GB/T 10870-2014 Active National standards

GB/T 10870-2014 The methods of performance test for water chilling(heat pump) packages using the vaper compression cycle

GB/T 10870-2014 The methods of performance test for water chilling(heat pump) packages using the vaper compression cycle

Publish Date: 2014-06-24 Implement Date: 2014-12-31 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us

Basic Information

Standard Code: GB/T 10870-2014
Standard Type: National standards
Standard Status: Active
is_force_gb: no
CCS Name: Refrigeration equipment
ICS Name: Refrigeration technology
Publish Date: 2014-06-24
Implement Date: 2014-12-31
Pages: 32 pages

Scope

This standard specifies the terms and definitions, test requirements, test methods, test deviations, total input power, and evaluation of the coefficient of performance for the main performance parameters of cold water (heat pump) units driven by electric motors and employing vapor compression refrigeration cycles.
This standard applies to the performance testing of cold water (heat pump) units driven by electric motors and employing vapor compression refrigeration cycles (hereinafter referred to as "units"). Cooling tower integrated units, brine units, and glycol units can be implemented in accordance with this standard.

Development Information

Word Count: 60 Thousand words Pages: 32 pages

Replace the following standards

Referenced Standards

GB/T 5773-2004 The methode of performance test for positive displacement refrigerant compressors GB/T 2624.1-2006 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full—Part 1:General principles and requirements GB/T 2624.2-2006 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full—Part 2:Orifice plates GB/T 2624.3-2006 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full—Part 3:Nozzles and Venturi nozzles GB/T 2624.4-2006 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full—Part 4:Venturi tubes GB/T 18430.1-2001 Water chilling (heat pump) packages using the vapor compression cycle Water chilling (heat pump) packages for industrial and commercial and similar application GB/T 18430.1-2007 Water chilling(heat pump) packages using the vapor compression cycle—Part 1:Water chilling(heat pump) packages for industrial & commercial and similar application GB/T 18430.1-2024 Water chilling(heatpump) packages using the vapor compression cycle—Part1:Water chilling(heatpump) packages for industrial & commercial and similar applications GB/T 18430.2-2001 Water chilling (Heat pump) Packages using the vapor compression cycle Household and similar water chilling (Heat pump) packages GB/T 18430.2-2008 Water chilling (heat pump) packages using the vapor compression cycle—Part 2:Water chilling (heat pump) packages for household and similar application GB/T 18430.2-2016 Water chilling(heat pump)packages using the vapor compression cycle—Part 2:Water chilling (heat pump) packages for household and similar application JB/T 7249-2022 Refrigeration and air conditioning equipment terminology JB/T 7249-1994 Refrigeration equipment terminology GB/T 50050-2017 Code for design of industrial recirculating cooling water treatment GB/T 18430.2-2025 Water chilling(heat pump) packages using the vapor compression cycle—Part 2:Water chilling(heat pump) packages for household and similar applications

Related Standards

Contact Us