NB/T 20358.8-2015 Abolished

NB/T 20358.8-2015

This standard specifies the budget quotas for the installation of automation control instrumentation in the nuclear island of nuclear power plant construction projects. This standard applies to the nuclear island projects of new and expansion projects of pressurized water reactor nuclear power units, as well as sub-items with nuclear safety requirements in the BOP projects, including nuclear island waste liquid storage tank buildings, conventional island waste liquid storage tank buildings, radioactive solid waste treatment auxiliary buildings, solid waste temporary storage warehouses, radioactive repair and decontamination workshops, etc. Other types of nuclear power reactors and nuclear engineering projects may refer to and use this standard for reference.

Publish Date: 2015-07-01

NB/T 20358.13-2015 Abolished

NB/T 20358.13-2015 NB/T 20358.13-2015 Nuclear Power Plant Construction Cost Setting Code - Part 13: Conventional Island Electrical Equipment Installation Engineering

This booklet is the 13th part: Electrical Equipment Installation Projects of Conventional Islands (hereinafter referred to as this quota), which is applicable to: electrical installations, lighting, communication, and thermal control devices of 600~1000MW nuclear power plant generating units; the scope of BOP sub-items applicable to this quota is shown in Annex 1: BOP sub-item list, and other BOP sub-item projects can refer to this quota for use.

Publish Date: 2015-07-01

NB/T 20358.6-2015 Abolished

NB/T 20358.6-2015

This standard specifies the budget quotas for the ventilation and air conditioning installation works in the nuclear island of nuclear power plant construction projects. This standard applies to the nuclear island projects of new and expansion projects of pressurized water reactor nuclear power units, as well as to sub-items with nuclear safety requirements in the BOP projects, including nuclear island waste liquid storage tanks, conventional island waste liquid storage tanks, auxiliary buildings for radioactive solid waste treatment, solid waste temporary storage warehouses, and radioactive machine repair and decontamination workshops. Other types of nuclear power reactors and nuclear engineering projects can refer to and use this standard for reference.

Publish Date: 2015-07-01

NB/T 20356-2015 Abolished

NB/T 20356-2015 Nuclear power plant construction: Conventional island construction and installation engineering cost standard

This quota stipulates the quota for the construction and installation of the conventional island of nuclear power plants. This quota applies to the construction and installation of the conventional island and BOP of pressurized water reactor nuclear power units and their expansion projects. Other similar projects can refer to it for use, but when the project quantity changes significantly, the various fee calculation coefficients should be adjusted appropriately.

Publish Date: 2015-07-01

NB/T 20358.12-2015 Abolished

NB/T 20358.12-2015

This standard is applicable to the installation of thermal equipment for new construction and expansion of the conventional island and auxiliary BOP of second-generation and second-generation improved nuclear power units with a capacity of 600~1000 MW; the scope of BOP sub-items applicable to this standard is shown in Annex 1: BOP sub-item list, and other BOP sub-item projects can refer to this standard for use.

Publish Date: 2015-07-01

NB/T 20358.9-2015 Abolished

NB/T 20358.9-2015

This standard specifies the budget quotas for the installation of communication equipment in the nuclear island of nuclear power plants. This standard applies to the nuclear island projects of new and expanded pressurized water reactor nuclear power units, as well as to the nuclear island waste liquid storage tank buildings, conventional island waste liquid storage tank buildings, radioactive solid waste treatment auxiliary buildings, solid waste temporary storage warehouses, radioactive machine repair and decontamination workshops, and other sub-items with nuclear safety requirements in BOP projects. Other types of nuclear power plants and nuclear engineering projects can refer to and use it for reference.

Publish Date: 2015-07-01

NB/T 20358.3-2015 Abolished

NB/T 20358.3-2015

This standard specifies the budget quotas for the nuclear island steel structure projects in nuclear power plant construction. This standard applies to the nuclear island projects of new and expanded pressurized water reactor nuclear power units, as well as to sub-items with nuclear safety requirements in the BOP projects, including the nuclear island waste liquid storage tanks, the conventional island waste liquid storage tanks, the auxiliary buildings for radioactive solid waste treatment, the temporary storage of solid waste, and the radioactive repair and decontamination workshops. Other types of nuclear reactors and nuclear engineering projects can refer to and use this standard for reference.

Publish Date: 2015-07-01

NB/T 20358.4-2015 Abolished

NB/T 20358.4-2015

This standard specifies the budgetary norms for the installation of nuclear island mechanical equipment in nuclear power plant construction projects. This standard applies to the nuclear island projects of new and expansion projects of pressurized water reactor nuclear power units, as well as to sub-items with nuclear safety requirements in the BOP projects, such as the nuclear island waste liquid storage tank buildings, the conventional island waste liquid storage tank buildings, the auxiliary buildings for radioactive solid waste treatment, the temporary storage warehouses for solid waste, and the radioactive machine repair and decontamination workshops. Other types of nuclear power reactors and nuclear engineering projects may refer to and use this standard for reference.

Publish Date: 2015-07-01

NB/T 20355-2015 Abolished

NB/T 20355-2015 Nuclear power plant construction project nuclear island construction and installation engineering cost standard

This quota stipulates the quota for the construction and installation of the nuclear island in nuclear power plants. This quota applies to the nuclear island projects of new and expansion projects of pressurized water reactor nuclear power units, as well as to sub-items with nuclear safety requirements in the BOP projects, such as the nuclear island waste liquid storage tank plant, the conventional island waste liquid storage tank plant, the auxiliary plant for radioactive solid waste treatment, the temporary storage of solid waste, and the radioactive repair and decontamination workshop. Other types of nuclear power projects and nuclear engineering projects can refer to and use this quota for reference

Publish Date: 2015-07-01

NB/T 20350-2015 Abolished

NB/T 20350-2015 The quality assurance classification and management requirements for the design and construction phase of a passive nuclear power plant

This standard specifies the quality assurance grading principles for structures, systems, and components (hereinafter referred to as "items") in the design and construction phase of non-active nuclear power plants, as well as the related activities in various fields (including design, procurement, manufacturing, and construction), and the management requirements for each level of quality assurance in each field. This standard applies to the quality assurance grading of items in the design and construction phase of non-active nuclear power plants, as well as the quality assurance grading management of related activities in the design, procurement, manufacturing, and construction fields. The management of activities related to parts and materials can be used for reference, and the quality assurance grading in the design and construction phase of other types of nuclear power plants can also be used for reference.

Publish Date: 2015-07-01

NB/T 20358.5-2015 Abolished

NB/T 20358.5-2015

This standard specifies the budgetary standards for the installation of nuclear island pipelines in nuclear power plant construction projects. This standard applies to the nuclear island projects of new and expansion projects of pressurized water reactor nuclear power units, as well as to sub-items with nuclear safety requirements in the BOP projects, including nuclear island waste liquid storage tanks, conventional island waste liquid storage tanks, auxiliary buildings for radioactive solid waste treatment, solid waste temporary storage facilities, and radioactive machine repair and decontamination workshops. Other types of nuclear reactors and nuclear engineering projects can refer to and use this standard for reference.

Publish Date: 2015-07-01

NB/T 20358.1-2015 Abolished

NB/T 20358.1-2015

This standard specifies the budget quotas for the nuclear island construction projects in nuclear power plant construction projects. This standard applies to the nuclear island projects of new and expanded pressurized water reactor nuclear power units, as well as the nuclear island waste liquid storage tank buildings, conventional island waste liquid storage tank buildings, auxiliary buildings for radioactive solid waste treatment, temporary storage of solid waste, and radioactive repair and decontamination workshops in BOP projects, which have nuclear safety requirements. Other types of nuclear power reactors and nuclear engineering projects can refer to and use this standard for reference

Publish Date: 2015-07-01