GB/T 17215.221-2021 Active National standards

GB/T 17215.221-2021 Electricity metering equipment(a.c.)—General requirements, tests and test conditions—Part 21:Tariff and load control equipment

GB/T 17215.221-2021 Electricity metering equipment(a.c.)—General requirements, tests and test conditions—Part 21:Tariff and load control equipment

Publish Date: 2021-03-09 Implement Date: 2021-10-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 102
Download

Basic Information

Standard Code: GB/T 17215.221-2021
Standard Type: National standards
Standard Status: Active
is_force_gb: no
CCS Name: \nElectricity measurement and load control system
ICS Name: The measurement of electrical and magnetic quantities
Publish Date: 2021-03-09
Implement Date: 2021-10-01
Pages: 33 pages

Scope

This part of GB/T 17215.2 specifies the general requirements for type testing of newly manufactured rate and load control equipment used indoors (such as electronic ripple control receivers and time switches used for controlling electrical loads, multi-rate meters, and maximum demand indicators).
This part does not specify the internal structure details of rate and load control equipment.
If the rate and load control functions are integrated into multifunctional meters, the relevant parts of this part also apply.
This part does not cover acceptance testing and conformity testing. For acceptance testing requirements, see Appendix F.
For general safety requirements, see IEC 62052-31:2015.
For general reliability requirements, see the IEC 62059 series of standards referenced in the document.

Development Information

Word Count: 62 Thousand words Pages: 33 pages

Same series standard

Referenced Standards

Adopt standards

IEC 62052-21:2016

Related Standards

Contact Us