GB/T 18482-2026 Active National standards

GB/T 18482-2026 Code for startup and commissioning of reversible pumped storage units

GB/T 18482-2026 Code for startup and commissioning of reversible pumped storage units

Publish Date: 2026-04-30 Implement Date: 2026-04-30 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 113
Out of stock

Basic Information

Standard Code: GB/T 18482-2026
Standard Type: National standards
Standard Status: Active
is_force_gb: no
CCS Name: Other
ICS Name: Hydraulic engineering
Publish Date: 2026-04-30
Implement Date: 2026-04-30
Pages: 40 pages

Scope

This document specifies the start-up and trial run procedures for reversible pumped storage units (hereinafter referred to as "units"), including the technical requirements for pre-startup preparation, start-up testing, trial run, and handover.
This document is applicable to the start-up and trial run of reversible pumped storage fixed-speed units.

Development Information

Word Count: 60 Thousand words Pages: 40 pages

Replace the following standards

Referenced Standards

GB/T 9652.1-1997 Specifications of governors and pressure oil supply units for hydraulic turbines GB/T 9652.1-2007 Specifications of control systems for hydraulic turbines GB/T 9652.1-2019 Specification of hydraulic turbine governing systems GB/T 20834-2007 Fundamental technical specifications for generator-motor GB/T 20834-2014 Fundamental technical specifications for generator-motor GB/T 20834-2024 Technical requirements for motor-generator GB/T 22581-2008 Fundamental technical requirements for francis pump-turbine GB/T 22581-2024 Fundamental technical requirements for Francis pump-turbines GB/T 32584-2016 Evaluation of mechanical vibration for machine sets in hydraulic power plants and pump-storage plants GB/T 32894-2016 Technical guide of mode transition for pumped storage unit GB/T 32899-2016 Test code of SFC starting device for pumped storage power unit GB/T 36550-2018 Basic terminology of pumped storage power station GB/T 38334-2019 Technical specification for black-start of hydropower station GB 38755-2019 Code on security and stability for power system GB/T 40589-2021 Modeling guide for excitation system of synchronous generator GB/T 40591-2021 Guide for setting test of power system stabilizer GB/T 40593-2021 Guidelines for parameters measurement and modeling of synchronous generator governing system GB/T 40594-2021 Technical guide for power grid and source coordination GB/T 40595-2021 Guide for technology and test on primary frequency control of grid-connected power resource GB 50150-2016 Electric equipment installation engineering - standard for hand-over test of electric equipment DL/T 1523-2023 Synchronizing generator forward test guidelines DL/T 1523-2016 DL/T 1523-2016 Synchronous Generator Phase-in Test Guidelines DL/T 1802-2018 Hydroelectric power plant automatic generation control and automatic voltage control technical specifications DL/T 1860-2018 Automatic Voltage Control Test Technical Guidelines

Related Standards

Contact Us