GB/T 45906.9-2025 Active National standards

GB/T 45906.9-2025 Substation secondary system—Part 9:Construction specifications

GB/T 45906.9-2025 Substation secondary system—Part 9:Construction specifications

Publish Date: 2025-08-01 Implement Date: 2026-02-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 36.00
Out of stock

Basic Information

Standard Code: GB/T 45906.9-2025
Standard Type: National standards
Standard Status: Active
is_force_gb: no
CCS Name: Electricity
ICS Name: Substations, surge arrestors
Publish Date: 2025-08-01
Implement Date: 2026-02-01
Pages: 16 pages

Scope

This document specifies the general requirements, design principles, process control, and technical requirements for the construction of the secondary system of substations.
This document is applicable to the construction, operation, maintenance, and repair of the secondary system of substations.

Development Information

Word Count: 23 Thousand words Pages: 16 pages

Same series standard

Referenced Standards

GB/T 2887-2000 Specification for electronic computer field GB/T 2887-2011 General specification for computer field GB/T 7261-2000 Basic testing method for relay and equipment GB/T 7261-2008 Basic testing method for relaying protection and security automatic equipment GB/T 7261-2016 Basic testing method for relaying protection and security automatic equipment GB 8897.4-2002 Primary batteries—Part 4:Safety of lithium batteries GB 8897.4-2008 Primary batteries—Part 4:Safety of lithium batteries GB 14285-1993 Technical code for relaying protection and security automatic equipment GB/T 14285-2006 Technical code for relaying protection and security automatic equipment GB/T 14285-2023 Technical code for relaying protection and security automatic equipment GB/T 17215.211-2006 Electricity metering equipment(a.c.)—General requirements,tests and test conditions—Part 11:Metering equipment GB/T 17215.211-2021 Electricity metering equipment(AC)—General requirements,tests and test conditions—Part 11:Metering equipment GB/T 17215.301-2007 Particular requirements for multi-function electricity meters GB/T 17215.301-2024 Electricity metering equipment(AC)—Particular requirements—Part 1:Multi-function electricity meters GB/T 20840.7-2007 Instrument transformers—Part 7:Electronic voltage transformers GB/T 20840.8-2007 Instrument transformers—Part 8:Electronic current transformers GB 23864-2009 Firestop material GB 23864-2023 Firestop material GB/T 36050-2018 Rules of time synchronization for power systems GB/T 36283-2018 General technical specifications for secondary cabin of smart substation GB/T 36572-2018 Guidelines of cyber security protection for electric power system supervision and control GB 38755-2019 Code on security and stability for power system GB 50169-2016 Code for construction and acceptance of grounding connection electric equipment installation engineering GB 50171-2012 Code for construction and acceptance of switchboard outfit complete cubicle and secondary circuit electric equipment installation engineering GB 50172-2012 Code for construction and acceptance of battery electric equipment installation engineering GB 50217-2018 Standard for design of cables of electric power engineering GB/T 50976-2014 Code for Installation and Acceptance of Protection Equipment and Secondary Circuit in Infrastructure Project GB/T 51420-2020 Standard for commissioning and acceptance of smart substation GB/T 45906.1-2025 Substation secondary system—Part 1:General requirement GB/T 45906.2-2025 Substation secondary system—Part 2:Data and model GB/T 45906.3-2025 Substation secondary system—Part 3:Communication message specification GB/T 45906.4-2025 Substation secondary system—Part 4:Cyber security protection GB/T 45906.5-2025 Substation secondary system—Part 5:Protection and control system with their equipment's requirements GB/T 45906.6-2025 Substation secondary system—Part 6:Substation monitoring and control system GB/T 45906.7-2025 Substation secondary system—Part 7:Centralized monitoring and control system GB/T 45906.8-2025 Substation secondary system—Part 8:Preventing electric mal-operation DL/T 687-2010 Microcomputer-based Electrical Misoperation Prevention Operating System General Technical Specification DL/T 687-1999 Micro-type device for preventing electrical misoperation, general technical specification DL/T 687-2024 DL/T 687-2024 Microcomputer-based Preventive Maintenance Operating System Technical Specification。 DL/T 782-2001 Start-up and Acceptance Procedures for 110kV and above Transmission and Substainal Engineering Projects DL/T 866-2015 The selection and calculation procedures for current and voltage transformers DL/T 866-2004 Guidelines for selecting and calculating current and voltage transformers DL/T 995-2016 DL/T 995-2016 Inspection Regulations for Relay Protection and Automatic Equipment for Power Grid Safety DL/T 995-2006 The inspection regulations for relay protection and automatic equipment for power grid security DL/T 1074-2019 Electricity integrated with both DC and AC uninterrupted power supply DL/T 1074-2007 Electricity integrated with DC and AC uninterrupted power supply equipment DL/T 1403-2015 Intelligent Substation Monitoring System Technical Specification DL/T 1404-2015 Substation monitoring system technical specifications for preventing electrical misoperation DL/T 1404-2024 DL/T 1404-2024 Substation Monitoring System Technical Specification for Preventing Electrical Misoperation DL/T 1879-2018 Intelligent Substation Monitoring System Acceptance Specification DL/T 2765-2024 DL/T 2765-2024 Code Specification for Logic Model of Power Transmission and Transformation Engineering DL/T 5002-2005 Specifications for the design of dispatch automation in district power networks DL/T 5003-2017 DL/T 5003-2017 Design Regulations for Power System Dispatching Automation。 DL/T 5003-2005 Specifications for the design of dispatch automation in electric power systems DL 5009.3-2013 Code of safety operation in power engineering construction Part 3: substation DL/T 5044-2014 Electric power engineering DC power supply system design technical regulations DL/T 5044-2004 Technical code for designing DC system of power projects DL/T 5136-2012 Nuclear Power Plant Secondary Circuit Design Technical Regulations DL/T 5149 DL/T 5202-2022 Electricity Measurement System Design Procedures DL/T 5202-2004 Electricity measurement system design technical regulations DL/T 5430-2023 DL/T 5430-2023 Design Regulations for Remote Monitoring Center of Unattended Substation DL/T 5430-2009 Technical code for designing of remote monitoring and control center about unattended substation DL/T 5491-2014 Electric Power Engineering Intermittent Power Supply Design Technical Specification DL/T 5518 DL/T 5560-2019 Code for engineering design of electric powerdispatching data network DL/T 5599 DL/T 5625 DL/T 5740-2016 Technical specification for construction of smart substation DL/T 5780-2018 Guidelines for the construction of an intelligent substation monitoring system DL/T 5866-2023 DL/T 5866-2023 Electrical installation engineering specification for wiring construction and acceptance of electrical equipment, cabinets, and secondary circuits NB/T 11315-2023 Design Regulations for Substation Auxiliary Control System

Related Standards

Contact Us